Fibre network validation for transport, utility and OT networks

Turn complex fibre optic network data into a trusted network.

FibreHops checks that your Cable Schedule, Patching Schedule and link list agree, finds every conflict before commissioning, and hands over fibre records your maintainer can trust.

Road tunnels Motorways ITS Rail OT networks
Multiple records, one viewCompare cable, patching and link data
Find inconsistenciesIdentify missing or conflicting records
Trace fibre pathsUnderstand the hops between endpoints
Improve handoverSupport review and consistent documentation

The FibreHops difference

Validate. Find conflicts. Hand over with confidence.

Eliminate late surprises, keep your fibre data in sync, and deliver accurate, maintainable records for critical transport infrastructure.

FibreHops conflicts screen with findings grouped by category (demo data)

Cross-checks your data

Compares your Cable Schedule, Patching Schedule and link list, end to end.

A technician patching a yellow fibre lead into a panel

Finds every conflict

Pinpoints mismatches, missing connections and wrong terminations before commissioning.

FibreHops splicing diagram showing fibre cores spliced through a joint to a FOBOT (demo data)

Handover-ready records

Clear, consistent fibre records your maintainer can trust and use.

Product capabilities

See the physical network behind every spreadsheet row.

FibreHops is designed around the connections engineers actually document—from cable segments and core IDs to optical distribution frames, patch leads and field switch ports.

Schedule reconciliation

Compare cable schedules, patching information and expected device links so mismatches are easier to locate and review.

CABLE · PATCHING · LINKS

End-to-end route tracing

Follow a logical link through devices, patch leads, ports, fibre cores and splice points to review connectivity.

DEVICE → DEVICE

Conflict identification

Flag duplicate assignments, inconsistent terminations and broken continuity that require engineering attention.

REVIEWABLE FINDINGS

Fibre core and port mapping

Relate fibre identities to their terminating ports across cabinets, FOBOTs and intermediate connection points.

CORES · PORTS · CONNECTORS

Topology and splicing views

Communicate the connection hierarchy through visual diagrams that support design reviews and field handover.

PATHS · JOINTS · CABINETS

Reports and review outputs

Bring findings and corrected network records into a clearer package for coordination, validation and maintenance.

ISSUES · EXPORTS · HANDOVER

Capabilities and output formats depend on project data, configuration and the product version; request a walkthrough for a specific workflow.

See it in action

From three schedules to a single, validated fibre network.

FibreHops reads your schedules, checks every connection, and highlights conflicts with clear, actionable results.

XCable Schedule
XPatching Schedule
XLink list
Validation engine
  • Links traced end to end
  • Cables matched across schedules
  • Conflicts found, each with a fix
  • Handover records ready

Interactive engineering example

One link. Six hops. Every sector.

Example links traced hop by hop through switches, patch panels, cables and joints, across tunnels, motorways, rail, utilities and OT networks. All values are illustrative.

LINK-0473 · Control room switch to tunnel field switchILLUSTRATIVE DATA
LINK-0473 · Control room switch to tunnel field switch (illustrative data)LINK-1558 · Control room switch to PA and emergency phone node (illustrative data)LINK-1021 · TMC switch to roadside ITS cabinet (illustrative data)LINK-2210 · Station comms room to platform switch (illustrative data)LINK-4127 · Telecom backbone to wayside gateway (illustrative data)LINK-3304 · SCADA core switch to substation LAN switch (illustrative data)LINK-5102 · Core ring to remote edge switch (illustrative data)LINK-6001 · Operations core to edge services switch (illustrative data)

Same link in FibreHops Physical path · demo data

Review required: the Patching Schedule puts the far-end lead on FOBOT port 09, but core 07 terminates on port 07.

Example only. A discrepancy is not proof that the physical installation is wrong; confirm against approved drawings and field records before changing a schedule or patch lead.

Conflict detection

See issues before they become rework.

Clear, actionable results show exactly where your cable, patching and link data disagree, so you fix it at the desk instead of in the tunnel.

Yellow patch leads labelled TUN-EXT-001, TUN-EXT-003, TUN-EXT-003 and TUN-EXT-004 plugged into a fibre panel

Conflict: same label on two leads

LabelPanel portStatus
TUN-EXT-003P02Match
TUN-EXT-003P03Duplicate

Expected TUN-EXT-002 on P03, by the Patching Schedule.

Product tour

See FibreHops at work.

Real screens from the FibreHops dashboard. They are shown with a demo network and dummy data, never client project data.

FibreHops · Fibre LinksDemo data
FibreHops network overview screen, shown with a demo network and dummy dataFibreHops rings and links screen, shown with a demo network and dummy dataFibreHops conflicts screen, shown with a demo network and dummy dataFibreHops cable joints screen, shown with a demo network and dummy data

Every cable, core, FOBOT and joint, counted from your schedules.

Delivery workflow

From fragmented schedules to a reviewable fibre record.

Give your design, construction and commissioning teams a common way to identify discrepancies before they become site rework.

01 / IMPORT

Bring the records together

Prepare cable schedules, patching records, link lists, location data and identifiers for cross-reference.

02 / RECONCILE

Compare connections

Check endpoint identities, ports, cores and relationships between the supplied datasets.

03 / RESOLVE

Investigate findings

Inspect the exact disagreement and determine which record or physical connection needs verification.

04 / HAND OVER

Improve the record set

Recheck updated information and prepare a more consistent network record for project handover.

See the difference

Don’t just say “there’s a problem.” Show exactly where records disagree.

A meaningful finding should identify the affected asset, show the two conflicting values and make the verification action obvious.

Here, the cable record and patching record refer to different far-end FOBOT ports for the same fibre core. An engineer must establish which record matches the approved connection.

Discuss your own schedules →
Example conflict · C-1101-1204 / core 07NEEDS REVIEW
SourceFar-end FOBOTPortInterpretation
Cable scheduleFOB-1204B07Expected termination
Patching scheduleFOB-1204B09Different port recorded
Link listSW-TUN-14Te1/0/2Destination switch
Suggested review: compare the signed-off termination schedule, approved as-built and physical patching before updating either record.

Project outcomes

Useful records for every stage of the asset lifecycle.

The goal is not another dashboard. It is better evidence for design review, site commissioning, operations and future changes.

01 / DESIGN

Network clarity

Understand intended topology, end points, cores, port allocation and connection dependencies.

02 / CONSTRUCTION

Coordinated documentation

Review changes and inconsistent schedule entries before they are propagated to other packages.

03 / COMMISSIONING

Focused discrepancy review

Locate questionable links, assign a review action and reconcile records against actual test and field evidence.

04 / HANDOVER

Maintainable asset information

Give maintainers a clearer picture of which fibre, port, joint and endpoint belongs to each connection.

05 / OPERATIONS

Faster fault investigation

Use the documented path to narrow the assets and connection points involved in troubleshooting.

06 / CHANGE CONTROL

Better future modifications

Review connectivity implications when adding services, reallocating cores or replacing field equipment.

Built for real-world infrastructure

Wherever fibre connects field devices to a control room.

Road tunnel with lane use signs and traffic

Road tunnels

Complex tunnel fibre networks, kept consistent across long runs, cross-passages and systems.

Motorway at dusk under an overhead gantry

Motorways

Backbone and ITS fibre, from roadside cabinets to control centres.

Cameras mounted on a roadside gantry

Intelligent Transportation Systems

From field devices to control rooms, keep every link right.

Passenger train on an electrified line

Rail & Metro

Fibre records for signalling, communications and operations.

PLC and RTU racks in a substation control building

OT / Industrial Networks

SCADA, PLC and control networks for utilities, water, energy and industrial sites.

A field engineer reviewing a FibreHops link trace on a rugged tablet (illustrative data)

Built for operational reality

Fibre records your maintainer can trust.

An accurate, consistent source of truth for operations, maintenance and future upgrades.

Engineering services

Fibre and ITS communications design.

Design and documentation for fibre networks on transport, utility and OT projects, from concept and detailed design through construction support to as-built handover. Delivered remotely Australia-wide, with on-site support in Sydney and Melbourne.

14+ yearsFibre optic, ITS and communications engineering
Motorways, Rail, Utilities, OTAustralian and international infrastructure
Concept to as-builtDesign, construction support, commissioning
Australia-wideRemote delivery, on site in Sydney and Melbourne

Fibre network design

Backbone and distribution design, cable routes, core allocation and fibre ring architecture.

Cable, splicing and patching schedules

Clear, consistent schedules prepared to your project's standards and ready for construction.

Racks, Cabinets & Patch Panel Layouts

Rack, cabinet, FOBOT and patch panel layouts, block diagrams and splicing diagrams.

ITS Communication Design

Field and OT networks for CCTV, signs, PA, SCADA, PLCs and tunnel systems.

Design review and records audit

Independent review of fibre designs and records, with the issues and fixes set out clearly.

Commissioning & As-Built Records

Support through testing and commissioning, and as-built records your maintainer can rely on.

Engaged per package, per project phase, or as part of your design team.

Let's talk about your project

Frequently asked questions

Practical answers before you share your schedules.

FibreHops is intended to support engineering judgement—not replace design approvals, field testing or commissioning procedures.

What information does FibreHops need?

Typically, a cable schedule, patching or termination schedule and an expected link list. Cable IDs, core numbers, device and cabinet IDs, endpoint ports and joint information help establish meaningful continuity. The exact import fields depend on the project structure.

Does FibreHops confirm that the physical fibre is installed correctly?

No. Record validation identifies inconsistencies in the supplied data. Physical installation must still be confirmed using approved as-built records, inspection and appropriate test results such as OLTS or OTDR where specified.

Can it handle long tunnel networks with intermediate splice joints?

The data model is designed around cables, cores, intermediate splice or pass-through points and terminations. A demo should verify the precise joint, segment and routing conventions used on your project.

Can we start with existing Excel schedules?

Yes, the intended workflow is to reuse existing engineering records rather than redraw the network manually. Column alignment, unique identifiers and data cleaning may be required for a reliable import.

Is it intended for fibre designers or asset maintainers?

Both can benefit, but in different ways. Design and construction teams focus on reconciliation and coordination; maintainers rely on clear, consistent records to understand actual routes and locate connection points.

Does FibreHops replace network-management or monitoring software?

No. It focuses on documenting and validating physical fibre connectivity. It is not a substitute for live network telemetry, switch monitoring, OT cybersecurity platforms or a formal testing system.

How do I evaluate it for our project?

Request a walkthrough using a representative set of non-sensitive, de-identified schedule rows. Confirm the required validation rules, outputs, data handling and deployment needs before sharing confidential project data.

Know where every fibre goes.

Explore a FibreHops walkthrough or discuss a targeted fibre records review.

Request a project walkthrough →

Contact

Let's talk about your project

Whether you want a FibreHops demo or a fibre specialist on your team, send a short note and we will reply within one business day.

  • FibreHops demo for your schedules
  • Fibre design specialist on site in Sydney and Melbourne
  • Remote work anywhere in Australia

Email us directly:

hello@fibrehops.com.au

Send us a message

We reply within one business day. Prefer email? Write to us at the address on the left.