Cross-checks your data
Compares your Cable Schedule, Patching Schedule and link list, end to end.
Fibre network validation for transport, utility and OT networks
FibreHops checks that your Cable Schedule, Patching Schedule and link list agree, finds every conflict before commissioning, and hands over fibre records your maintainer can trust.
The FibreHops difference
Eliminate late surprises, keep your fibre data in sync, and deliver accurate, maintainable records for critical transport infrastructure.
Compares your Cable Schedule, Patching Schedule and link list, end to end.
Pinpoints mismatches, missing connections and wrong terminations before commissioning.
Clear, consistent fibre records your maintainer can trust and use.
Down to the core
Product capabilities
FibreHops is designed around the connections engineers actually document—from cable segments and core IDs to optical distribution frames, patch leads and field switch ports.
Compare cable schedules, patching information and expected device links so mismatches are easier to locate and review.
CABLE · PATCHING · LINKSFollow a logical link through devices, patch leads, ports, fibre cores and splice points to review connectivity.
DEVICE → DEVICEFlag duplicate assignments, inconsistent terminations and broken continuity that require engineering attention.
REVIEWABLE FINDINGSRelate fibre identities to their terminating ports across cabinets, FOBOTs and intermediate connection points.
CORES · PORTS · CONNECTORSCommunicate the connection hierarchy through visual diagrams that support design reviews and field handover.
PATHS · JOINTS · CABINETSBring findings and corrected network records into a clearer package for coordination, validation and maintenance.
ISSUES · EXPORTS · HANDOVERCapabilities and output formats depend on project data, configuration and the product version; request a walkthrough for a specific workflow.
See it in action
FibreHops reads your schedules, checks every connection, and highlights conflicts with clear, actionable results.
Interactive engineering example
Example links traced hop by hop through switches, patch panels, cables and joints, across tunnels, motorways, rail, utilities and OT networks. All values are illustrative.
Same link in FibreHops Physical path · demo data
Review required: the Patching Schedule puts the far-end lead on FOBOT port 09, but core 07 terminates on port 07.
Example only. A discrepancy is not proof that the physical installation is wrong; confirm against approved drawings and field records before changing a schedule or patch lead.
Conflict detection
Clear, actionable results show exactly where your cable, patching and link data disagree, so you fix it at the desk instead of in the tunnel.
Conflict: same label on two leads
| Label | Panel port | Status |
|---|---|---|
| TUN-EXT-003 | P02 | Match |
| TUN-EXT-003 | P03 | Duplicate |
Expected TUN-EXT-002 on P03, by the Patching Schedule.
Product tour
Real screens from the FibreHops dashboard. They are shown with a demo network and dummy data, never client project data.
Every cable, core, FOBOT and joint, counted from your schedules.
Delivery workflow
Give your design, construction and commissioning teams a common way to identify discrepancies before they become site rework.
Prepare cable schedules, patching records, link lists, location data and identifiers for cross-reference.
Check endpoint identities, ports, cores and relationships between the supplied datasets.
Inspect the exact disagreement and determine which record or physical connection needs verification.
Recheck updated information and prepare a more consistent network record for project handover.
See the difference
A meaningful finding should identify the affected asset, show the two conflicting values and make the verification action obvious.
Here, the cable record and patching record refer to different far-end FOBOT ports for the same fibre core. An engineer must establish which record matches the approved connection.
Discuss your own schedules →| Source | Far-end FOBOT | Port | Interpretation |
|---|---|---|---|
| Cable schedule | FOB-1204B | 07 | Expected termination |
| Patching schedule | FOB-1204B | 09 | Different port recorded |
| Link list | SW-TUN-14 | Te1/0/2 | Destination switch |
Project outcomes
The goal is not another dashboard. It is better evidence for design review, site commissioning, operations and future changes.
Understand intended topology, end points, cores, port allocation and connection dependencies.
Review changes and inconsistent schedule entries before they are propagated to other packages.
Locate questionable links, assign a review action and reconcile records against actual test and field evidence.
Give maintainers a clearer picture of which fibre, port, joint and endpoint belongs to each connection.
Use the documented path to narrow the assets and connection points involved in troubleshooting.
Review connectivity implications when adding services, reallocating cores or replacing field equipment.
Built for real-world infrastructure
Complex tunnel fibre networks, kept consistent across long runs, cross-passages and systems.
Backbone and ITS fibre, from roadside cabinets to control centres.
From field devices to control rooms, keep every link right.
Fibre records for signalling, communications and operations.
SCADA, PLC and control networks for utilities, water, energy and industrial sites.
Built for operational reality
An accurate, consistent source of truth for operations, maintenance and future upgrades.
Engineering services
Design and documentation for fibre networks on transport, utility and OT projects, from concept and detailed design through construction support to as-built handover. Delivered remotely Australia-wide, with on-site support in Sydney and Melbourne.
Backbone and distribution design, cable routes, core allocation and fibre ring architecture.
Clear, consistent schedules prepared to your project's standards and ready for construction.
Rack, cabinet, FOBOT and patch panel layouts, block diagrams and splicing diagrams.
Field and OT networks for CCTV, signs, PA, SCADA, PLCs and tunnel systems.
Independent review of fibre designs and records, with the issues and fixes set out clearly.
Support through testing and commissioning, and as-built records your maintainer can rely on.
Engaged per package, per project phase, or as part of your design team.
Let's talk about your projectFrequently asked questions
FibreHops is intended to support engineering judgement—not replace design approvals, field testing or commissioning procedures.
Typically, a cable schedule, patching or termination schedule and an expected link list. Cable IDs, core numbers, device and cabinet IDs, endpoint ports and joint information help establish meaningful continuity. The exact import fields depend on the project structure.
No. Record validation identifies inconsistencies in the supplied data. Physical installation must still be confirmed using approved as-built records, inspection and appropriate test results such as OLTS or OTDR where specified.
The data model is designed around cables, cores, intermediate splice or pass-through points and terminations. A demo should verify the precise joint, segment and routing conventions used on your project.
Yes, the intended workflow is to reuse existing engineering records rather than redraw the network manually. Column alignment, unique identifiers and data cleaning may be required for a reliable import.
Both can benefit, but in different ways. Design and construction teams focus on reconciliation and coordination; maintainers rely on clear, consistent records to understand actual routes and locate connection points.
No. It focuses on documenting and validating physical fibre connectivity. It is not a substitute for live network telemetry, switch monitoring, OT cybersecurity platforms or a formal testing system.
Request a walkthrough using a representative set of non-sensitive, de-identified schedule rows. Confirm the required validation rules, outputs, data handling and deployment needs before sharing confidential project data.
Explore a FibreHops walkthrough or discuss a targeted fibre records review.
Contact
Whether you want a FibreHops demo or a fibre specialist on your team, send a short note and we will reply within one business day.
Email us directly: